通比牛牛

Sanming College's announcement on the announcement of the list of basic education and teaching reform projects for Sanming in 2019 and its construction management

浏览次数: 816 Release time: 2019-12-06 Browse times: 816

Project leaders and related schools:

59 号)文件精神,三明市教育局与三明学院联合组织专家对全市中小学幼儿园教师申报的课题进行评审,确定张桂玲等 19 位教师申报的课题为三明学院 2019 年面向三明市基础教育教学改革项目。 According to the spirit of the "Sanming Education Bureau's Notice on Organizing Elementary and Middle School Kindergartens and Sanming Colleges to Develop Basic Education Cooperation" (Ming Jiaoren [2019] No. 59 ), the Sanming Education Bureau and Sanming Colleges jointly organized experts for elementary and middle school kindergarten teachers The applied topics were reviewed, and 19 teachers including Zhang Guiling were determined to be the subject of Sanming College's 2019 basic education and teaching reform project in Sanming. For each project, Sanming College hires at least one co-teacher with a title of vice high school or above to guide and assist the project research. 1 ),并将项目建设管理有关事项通知如下: The results are now announced (Annex 1 ), and the matters related to project construction management are notified as follows:

I. Project construction requirements

2019 10 月— 2020 10 月)。 (1) The research cycle of the project is 1 year ( October 2019- October 2020 ). The person in charge of the project should make reasonable arrangements to ensure that the project proceeds as planned and achieve the project work goals.

(2) The project concludes with a research paper related to the project. The paper must be published in a regular journal with a CN number. When the project paper is published, it should be signed: Sanming College faces the basic education and teaching reform project of Sanming (project number).

Project acceptance

(1) After the project expires and is completed, the project team shall apply for closing inspection in time. The following materials are required to apply for acceptance:

2 )。 1. Sanming College's application for the completion of the basic education and teaching reform project in Sanming (Annex 2 ).

2. Attachment: Original and photocopy of the dissertation and other related results.

( 见应对项目实际完成的工作及应用效果作出评价,不少于300字 ) (2) The school where the person in charge of the project organizes an expert to conduct a preliminary evaluation of the completion of the project, review relevant materials, and carefully fill in the “audit opinion” in the application for closing the project . ( Opinions should evaluate the actual work and application effects of the project. Less than 300 words ) .

(3) Sanming College shall organize experts to conduct final acceptance and give acceptance opinions based on the acceptance documents and other acceptance documents submitted by the relevant schools.

(4) The project that passed the acceptance check was identified as the municipal education reform project in charge of the project, and the school-level education reform project of Sanming College, the project's cooperative teacher.

(5) For projects that fail to fulfill the contract on schedule or that the final acceptance does not meet the requirements, if the project is valid, upon application by the person in charge of the project, it can be extended up to one year in principle. During the extension period, the project leader will no longer apply for a new project. If no acceptance is applied for after the extension period has expired, it shall be handled as failed acceptance.

Those who fail the acceptance check will cancel the project and recover the funds allocated for the project. At the same time, project leaders will not be allowed to apply for new projects within 2 years.

3. Project Fund Management

(1) The project was funded by 3,000 yuan from Sanming College. Funds are used by the person in charge of the project and assisted by the project cooperation teacher.

(2) Scope of expenditure: The project expenditure should be closely related to the construction content of the project, the special funds should be used exclusively, and strictly implemented in accordance with the relevant financial management regulations of Sanming College. The savings of the project can be used for other education reform projects, and should not be used for other expenses not related to the project. Expenditure range:

1. Paper Layout Fee: The cost of research papers and practice published papers.

2. Research expenses, travel expenses: The survey research, expert consultation, and participation in education reform and research conferences required for the project. 20% It should not exceed 20% of the total funding .

3. Documents purchase and printing costs: Documents and software required for the project, software acquisition, and document retrieval and printing costs.

4. Equipment purchase cost: The purchase cost of related teaching equipment and equipment required for the project.

5. Staff costs: In the process of project construction, it is used to organize related implementation costs, project demonstration, and achievement appraisal. 12% It should not exceed 12% of the total funding .

6. Project management fees: Expenditures necessary for the implementation of the project management process, including expenses for auditing, demonstration, review, and acceptance organization. 5 %。 It should not exceed 5 % of the total funding .

7. Other costs related to project construction.

1 比例核拨。 (3) Appropriation of funds: Project funds are divided into start-up funds and final funds, which are allocated at a ratio of 2 : 1 . The settlement funds are approved after the project application has passed the acceptance check.

(IV) Approval procedures for fund reimbursement: The person in charge of the project is specifically responsible for the management of project expenditures. All expenses in the project shall be submitted to the accounting department of Sanming College for review after the preliminary review of the school where the project leader is located, submitted to the Teachers ’Department for approval, and completed the“ Review of Sanming College Teaching Reform and Quality Engineering Project Funding Reimbursement Review Form ”(Annex 3) for reimbursement.

(5) Supervision of the use of funds: During the implementation of the project, the person in charge of the project shall use the funds strictly in accordance with the scope of the expenditure, ensure that the special funds are used exclusively, and accept the supervision and inspection by the competent higher authority, finance, auditing and other departments in accordance with the law.

三明学院教育教学改革与质量工程建设项目实施与管理办法 》(明院办政〔2010〕 35 号)执行。 (6) The project fund management shall be implemented with reference to the " Implementation and Management Measures of Education and Teaching Reform and Quality Engineering Construction Project of Sanming College " (Mingyuan Administration [2010] No. 35 ).

、材料报送 4. Submission of materials

The “Application for Educational Reform Project of Sanming College” needs to be stamped with the official seal of the school where the person in charge of the project is located, and a copy of the dissertation (including the front cover, back cover, copyright page, table of contents, text) should be provided. 402 办公室),电子材料( PDF 格式)发送至师范学部邮箱 smxysfxb@163.com The above paper materials are submitted to the Normal School Office (Address: Office 402 , Administrative Building, Sanming College, No. 25 Jingdong Road, Sanyuan District, Sanming City ), and the electronic materials ( PDF format) are sent to the normal school mailbox at smxysfxb@163.com 13850888932 Contact: Teacher Zhuo, Tel: 13850888932 .

See the attachment for details!

Notice of Sanming College on the announcement and construction management of the list of basic education and teaching reform projects for Sanming in 2019 (1) .doc